Skip to main content
Decorative ribbon
Decorative ribbon
Decorative ribbon

Plant Hire Software

Concrete Pump Hire Software for Trailer Pump and Boom Pump Operations

Manage concrete pump hire with LOLER inspection records, operator certification, pump hour billing, and accurate contractor invoicing.

Concrete Pump Hire Is High-Value, Safety-Critical, and Complex to Bill

A concrete boom pump costs hundreds of thousands of pounds and carries LOLER inspection obligations, operator certification requirements, and pump-hour-based service intervals. When billing is based on pump hours plus standing time, and pumps regularly overrun hire periods on live pours, the complexity of accurate invoicing overwhelms manual systems quickly.

Concrete Pump Hire From Dispatch to Accurate Invoice

1

LOLER Certificate Management

Store thorough examination certs per pump with automated expiry alerts — no pump mobilises without current documentation.

2

Operator Certification Tracking

Log CPCS pump card details and expiry per operator — hire blocked if certification has lapsed.

3

Pump Hour Metering

Record pump start and stop times per pour — invoiced at your pump hour rate with standing time billed separately.

4

Pour-Day Scheduling

Book pumps against pour schedules — the system flags conflicts if the same pump is double-assigned on the same day.

For Concrete Pump Hire Operators Running High-Value Assets

Pipeline and Accessory Tracking

Log delivery lines, reducers, and placing hoses dispatched per pour — charged if not returned or damaged.

Service Interval by Pump Hours

Track pump hours cumulatively — maintenance alerts fire at manufacturer-specified intervals before breakdowns occur on site.

Contractor and Main Contractor Billing

Issue invoices to groundwork subcontractors or main contractors with project references and pour sheet attachments.

Breakdown and Delay Records

Log pump breakdowns and pour delays with timestamps — used to calculate compensation credits accurately.

We run seven boom pumps. LOLER certs, operator cards, pump hours — Renttix tracks it all. Our invoices are accurate on the first issue and contractors stop querying them.

Dave Ashworth, Director
Midlands Concrete Pumping

Concrete Pump Hire Software — Common Questions

The operator logs pump start and end times on each pour day. The system calculates billable pump hours and standing time separately, applying your configured rates to each on the invoice.

Each pump has a compliance record. Thorough examination certificates are stored with expiry dates. The system blocks the pump from hire if a cert lapses and alerts you weeks before renewal is due.

Hire periods extend automatically when additional pump hours are logged. The system adds the overrun to the same booking and invoices at the same rate — no new booking or manual adjustment needed.

Yes — daily pour sheets are uploaded to the booking record and can be included as attachments with the contractor invoice for project cost allocation.

Ready to replace your spreadsheets?

Explore the full platform free for 14 days. No credit card required.

Concrete Pump Hire Software | Boom Pump Hire Management | Renttix