Temporary EV Charging Hire Is Growing Faster Than Operator Systems Can Manage
Film productions, festivals, and construction sites all need temporary EV charging for their vehicle fleets. Operators hiring out charger units without tracking load management requirements, cable lengths, and power supply compatibility risk overloading site circuits, damaging vehicles, and facing liability for electrical incidents. The sector is growing too fast for manual tracking.
Temporary EV Charging Hire Managed With Electrical Safety
Power Supply Compatibility Records
Log site power supply type, available amperage, and connection requirements per booking — preventing overloads and compatibility failures.
Charger Unit Serial Tracking
Every charger unit is tracked by serial number — dispatched per booking, inspected on return, service history per unit.
Cable and Connector Tracking
Log cable lengths, connector types (Type 2, CCS, CHAdeMO), and adapters per hire — all returned per booking.
Load Management Configuration Notes
Record load sharing configuration per multi-unit deployment — evidence of safe installation for any electrical incident investigation.
For EV Charger Hire Operators Serving Events, Film, and Construction
EVSE Certification Records
Store OLEV/OZEV compliance certification and electrical installation records per charger unit with renewal alerts.
kWh Usage Metering
Log kWh dispensed per charger per hire for energy cost pass-through billing to film productions and event organisers.
Fast and Slow Charger Sub-Fleets
Manage AC slow chargers, DC rapid chargers, and portable charge points as separate sub-fleets with appropriate pricing.
Production and Event Organiser Accounts
Film productions and festival organisers get account pricing and per-production or per-event consolidated invoicing.
Related workflows
Related industries
EV Charger Hire Software — Common Questions
Each booking records the available power supply details — three-phase or single-phase, available amperage, and connection type. The system checks the charger unit's power draw against available supply and flags any overload risk before dispatch.
Energy metering data is logged per charger per billing period. kWh consumption is calculated at your configured energy rate and added to the hire invoice as a pass-through charge with full metering data attached.
Yes — cable types and connectors are accessories logged per hire. Return inspections verify all cables are present and undamaged — missing or damaged connectors trigger replacement charges.
Load sharing configurations are recorded per deployment as part of the installation record. This documents the safe electrical design of the temporary charging infrastructure — available for any inspection or incident investigation.
Ready to replace your spreadsheets?
Explore the full platform free for 14 days. No credit card required.